Shine Court, Birtinya, Sunshine Coast

Alternative post-tensioned designed for the basement raft slab under a 7 storey residential building on the Sunshine Coast.

  • 1,800m2 of beam and slab raft. 
  • 30kPa hydrostatic pressure
  • Approximately 900m3 of Concrete
  • 17 tonne of post-tensioning strand.

Station Street Markets, Subiaco, Perth

We have just completed our first inspection on a newshopping centre development including Coles, a Target DDS and supportingspecialty retail with 6,000m2 of office space over three levels and associatedmulti-level parking facilities. Our scope was limited to the D&C design ofthe post-tensioned suspended slabs.

  • 23,000m2 of heavily loaded suspendedpost-tensioned Slabs.
  • Approximately 7000m3 of Concrete
  • 130 tonne of post-tensioning strand.

Fremantle College

"Design and Construct" of the level 1 slab (2 pours) for an extension to the Fremantle College in WA.

Final pour completed 18th October 2016.